.contact us |.about us
Home BizChina Newsphoto Cartoon LanguageTips Metrolife DragonKids SMS Edu
news... ...
             Focus on... ...
   

China counts down to Three Gorges geological hazard control
( 2002-02-07 10:39 ) (7 )

China will start the count down for the mitigation of geological hazards projects in the dam area of the world's largest hydro-power project underway at the Three Gorges, according to a government schedule, which came out Tuesday.

The Comprehensive Planning for the Geological Hazards and Mitigation Projects of Landslides and Collapses in the Three Gorges Reservoir Engineering Areas has just been approved by the State Council, announced the Chinese Ministry of Land and Resources (LRM) here Wednesday.

The 10-year planning will be implemented to meet the two damming deadlines of the world's largest reservoir respectively in 2003 and 2009.

The nearest target of the plan requires emergent works to treat all unstable sites along the embankments of the dam area which will be submerged under 135 meters of water in the first reservoir damming, scheduled for June 2003.

China appropriated 4 billion yuan last year from the special fund for the construction of the Three Gorges Project to finance the hazard mitigation projects. Prior to this, a 600 million yuan fund had been in place for the same purpose.

The ministry's geological survey has discovered more than 2,490 slide masses and 90 mud-rock flow claughes in the dam area.

"The total hazardous landslide deposits at the Three Gorges are estimated at 3 billion cubic meters. They will be brought under control with the implementation of the planning," said Li Lierong, director of the Geological Environment Department with LRM.

He said that the ecosystem in the dam area is fragile, with a loose soil texture and frequent occurrence of floods and rainstorms. The reservoir damming may cause large-scale landslides if hidden geological hazards are not taken care of in advance.

According to official figures, over 70 occurrences of landslides, collapses and mud-rock flows along the reservoir banks have been reported since 1982, which took some 400 lives and brought heavy economic losses.

Shou Jiahua, vice minister of land and resources, said that landslides and collapses are sporadic accidents, which need an effective monitoring system to send out early alarms.

She said that China is relying on both professional geological hazard monitoring technology and public reporting networks in the geological hazard control.

China has introduced advanced geo-monitoring technology for the hydro-power project since the 1980s, including GPS network and remote-sensing technology. The LRM has switched on a geological monitoring and alarm network covering 19 counties in the reservoir area which has been operating since 1999.

A special command office for the Three Gorges hazard control has been set up, which gathers officials with LRM, the State Development Planning Commission, the Ministry of Finance, the Ministry of Construction, the Ministry of Water Resources and the Three Gorges Project Construction Committee with the State Council. 

 
   
 
   

 

         
         
       
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
主站蜘蛛池模板: 国产精品第一页爽爽影院| 美女扒开大腿让男人桶| 奇米影视国产精品四色| 么公的又大又深又硬又爽视频| 男生把女生桶爽| 国产偷窥女洗浴在线观看| 91精品国产免费网站| 成人在线免费网站| 二十四小时日本高清在线www| 特级毛片www| 国产一区二区三区乱码在线观看| 中国午夜性春猛交xxxx| 欧美vpswindowssex| 伊人不卡久久大香线蕉综合影院 | 男人j插入女人p| 在线观看视频国产| 久久99精品久久久久久动态图| 精品亚洲成a人无码成a在线观看| 国产性天天综合网| ww美色吧com| 日本xxx网站| 亚洲不卡av不卡一区二区| 狠狠色综合7777久夜色撩人| 国产99久9在线视频| 91频在线观看免费大全| 成人自拍小视频| 久久精品一区二区三区日韩 | 男人操女人视频网站| 国产av人人夜夜澡人人爽麻豆| 韩国福利影视一区二区三区| 国产美女一级高清免费观看| jizzjizz日本护士| 成人毛片免费播放| 久久亚洲美女精品国产精品| 最近中文字幕电影大全免费版| 亚洲激情成人网| 男人与禽交的方法| 农村妇女色又黄一级毛片不卡| 自拍偷拍校园春色| 国产人妖XXXX做受视频| 黑人又大又硬又粗再深一点|