Dam of the Three Gorges Project
( 2003-07-03 15:01) (Chinadaily .com.cn)

1. Spillway
The Three Gorges Project is designed with a concrete gravity dam with a crest elevation of 185 meters and maximum height of 175 meters. The dam axis runs 2, 309. 47 meters long, which is even longer than the noted Grand Coulee Dam of US.

The 483-meter spillway, located in the middle of the main dam, has 23 bottom outlets dimensioned at 7?á9 meters. Each of its 22 surface sluice gates measures 8 meters wide. The maximum discharge capacity of the TGP is 116,000 cubic meters, the biggest in the world.

2. Left Powerhouse

Two powerhouses, flanking the spillway, accommodate altogether 26 sets of turbine-generators. As the world's biggest unit ever made, each has a generating capacity of 700MW. The 643.6-meter-long left powerhouse, 60 meters longer than the 584.2-meter-long right one, houses 14 sets of generators. With all these huge generators, the TGP is designed to generate electricity of 84.7 TW/h.

3.Right Powerhouse
On the right bank, enough room has been preserved for the future underground powerhouse of 6 turbine generator units with 4, 200 MW of installed capacity. The intakes of these units will be constructed simultaneously with the project.


4. Shiplift
The TGP shiplift is the world's largest. With a one-step vertical hoisting mechanism, the shiplock, equipped with a 120?á18?á3.5-meter container, is capable of carrying a 3,000-ton passenger liner or cargo boat at a time.

5.Temporary Shiplock
A temporary shiplock was built during the TGP construction period with an effective chamber at 240?á24?á4 meters.

6.Permanent Shiplock
The Three Gorges Project (TGP) permanent shiplock is designed in a two-way, five-step pattern with each lock chamber measuring 280?á34?á5 meters (L?áW?áD) and capable of passing a 10,000-ton barge fleet.

7.Dam Site
After a long but prudent study on 15 alternatives, the dam site for Three Gorges Project was finally determined at Sandouping, where a number of favorable factors gather at the small town 30 kilometers west to the Yichang city.
Sandoupin has a firm crystalline rock foundation, which is the most important geological condition a massive hydraulic project required of. The River valley here at Sandoupin is much broader than other site alternatives and hills on each sites lower.

A small islet, called Zhongbaodao by locals and cleaving the Yangtze River at its center, offers the most favorable pattern for the river diversion needs scheduled in the first phase of the TGP.

The bedrock of the dam site is sound and intact granite with 100 MPa of compressive strength. The faults and fissures in the bedrock are less developed and most of them are well cemented. The permeability of the rock mass and the weathered layers in the hills on both sides are also ideal.

No potentially devastating geological structures was detected within 15 kilometers of its vicinity. The regional seismic activities are small and not frequent.

   
Close  
  Go to Another Section  
     
 
 
     
  Article Tools  
     
  E-Mail This Article
Print Friendly Format
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
主站蜘蛛池模板: 91欧美精品激情在线观看最新| 少妇激情av一区二区| 日批视频在线看| 影音先锋在线免费观看| 夫妇交换性3中文字幕| 国内精品久久久人妻中文字幕| 国产精品久久久久久久久齐齐 | 中文字幕精品无码一区二区三区| 中文字幕亚洲日韩无线码| www.怡红院| 日韩毛片基地一区二区三区 | 国产精品无码无在线观看| 国产探花视频在线观看| 啊轻点灬大ji巴太粗太长了h | 日本不卡在线观看免费v| 日本一区二区视频| 波多野结衣在线不卡| 毛色毛片免费观看| 最近的中文字幕国语电影直播| 日韩欧美aⅴ综合网站发布| 成年人在线免费观看| 国产高清一级毛片在线人| 国产女人水多毛片18| 免费又黄又爽又猛的毛片| 亚洲乱码无码永久不卡在线| 中文字幕无线码欧美成人| 91精品国产免费久久国语麻豆| 青青草国产三级精品三级| 狠狠综合久久久久综合小说网| 晚上看b站直播软件| 欧美成人一区二区三区 | 正在播放国产精品放孕妇| 日本边添边摸边做边爱的视频 | 日本乱人伦电影在线观看| 在线免费观看毛片网站| 国产免费无码一区二区视频| 人人妻人人做人人爽| 久久亚洲欧美综合激情一区| 97av麻豆蜜桃一区二区| 色天天综合色天天看| 欧美专区在线播放|