Home/News

Ethiopian GD-3 TBM equipment officially starts

Updated: 2013-08-15

On Aug 10, relevant responsible persons of Ethiopian Electric Power Company and CGGC pressed down simultaneously on the start button of the TBM equipment, the cutter head of the new-generation tunnel boring machine that CGGC possesses proprietary intellectual property right began to work and a giant belt carried a steady flow of earth outside the tunnel, marking the official start of the TBM equipment in the GD-3 Hydropower Station.

Ethiopian GD3 (GENALE MULTIPURPOSE) Hydropower Station has an installed capacity of 254,000 kilowatts. The diversion tunnel of the project has a diameter of 8.1 meters and a total length of 12,336 meters, of which a length of 10,399 meters was built by means of TBM construction method. The φ8.1 meters hard-rock tunnel boring machine (DSU TBM), which is used in the GD-3 project, integrates the flexibility of open TBM and safety of shield-type TBM, representing a new-generation hard-rock excavating equipment in the world.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 久久综合狠狠综合久久97色| 精品国产一区二区三区香蕉| 超级乱淫视频播放日韩| av色综合网站| 911亚洲精品| 18videosex性欧美69| 91啪国产在线| 国产又污又爽又色的网站| 蜜芽忘忧草二区老狼果冻传媒| 色婷婷久久综合中文久久一本`| 老司机成人精品视频lsj| 泳衣男漫画臀篇佳门サエコcc| 欧美成人手机视频| 最新欧洲大片免费在线| 日本中文字幕有码在线视频| 扒开双腿疯狂进出爽爽动态图| 女人被男人桶得好爽免费视频| 好男人在线社区| 日本又粗又长一进一出抽搐| 尤物永久免费AV无码网站| 国产精品国产三级国产av剧情| 国产一在线观看| 亚洲欧美日韩久久精品第一区| 久久人人爽天天玩人人妻精品| caoporm超免费公开视频| 麻豆md传媒md00中国| 浪荡欲乱之合集| 扒开腿狂躁女人爽出白浆| 国产自产2023最新麻豆| 午夜时刻免费实验区观看| 久久国产色AV免费观看| 第一福利在线观看| 欧美特黄a级高清免费大片| 好男人好资源影视在线| 四虎影视永久免费观看地址| 久久精品国产大片免费观看| 香蕉视频在线观看男女| 欺凌小故事动图gif邪恶| 天天综合网天天综合色| 国产成人aaa在线视频免费观看| 国产一区二区三区美女|