Home/Our Business/Equipment Installation

Public Utility Installation at the Laxiwa Hydropower Station (China)

Updated: 2014-04-01

In terms of generating capacity, the Laxiwa Hydropower Station is the largest water power station on the upstream of the Yellow River. Its 750KV EHV power transmission equipment is the first of its kind in the world that has ever been installed in such a high-altitude cold region. Its gas-insulated metal-enclosed transmission lines with a 207-meter-drop in altitude are the first ever used in the world.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 精品国产v无码大片在线看| 足恋玩丝袜脚视频免费网站| 日韩欧美一二区| 亚洲第一页视频| 精品少妇人妻AV免费久久洗澡| 国产无人区卡一卡二卡三网站| а天堂中文最新一区二区三区 | 91理论片午午伦夜理片久久| 我和室友香蕉第二部分| 亚洲av永久综合在线观看尤物 | 精品一区二区三区在线播放视频| 国产日韩综合一区二区性色av| CAOPORN视频在线观看| 成年人性生活视频| 久青草无码视频在线观看| 污污的文章让人起反应的| 午夜精品久久久久久毛片| 高h全肉动漫在线观看最新| 国产羞羞视频在线播放| 一个色中文字幕| 无码人妻精品一区二区三区久久| 亚洲av人无码综合在线观看| 欧美视频日韩视频| 免费国产在线观看不卡| 色www视频永久免费男的天堂| 国产成人精品动图| 18禁无遮挡羞羞污污污污免费| 天堂√在线中文最新版8| 三级理论中文字幕在线播放| 日本护士xxxx爽爽爽| 亚洲w码欧洲s码免费| 欧美高清精品一区二区| 免费a级毛片高清在钱| 美女扒开屁股让男人桶| 国产伦一区二区三区高清| www卡一卡二卡三| 国产美女无遮挡免费视频| eeuss影院www新天堂| 岳的大白屁股光溜溜| 中文字幕在线观看免费视频| 日本孕妇大胆孕交|