Global EditionASIA 中文雙語(yǔ)Fran?ais
China
Home / China / Society

World's longest-span cable-stayed bridge undergoes load test before opening

Xinhua | Updated: 2025-06-19 10:09
Share
Share - WeChat
An aerial drone photo taken on May 24, 2025 shows the Changzhou-Taizhou Yangtze River Bridge under construction in East China's Jiangsu province. [Photo/Xinhua]

NANJING -- The final pre-opening safety checks have begun on the Changtai Yangtze River Bridge, the world's longest-span cable-stayed bridge, as engineers launched a high-stakes week-long load testing campaign on the hybrid rail-road structure early Tuesday in East China's Jiangsu province.

A series of scientifically rigorous load tests will thoroughly evaluate the actual performance of this world-class multifunctional bridge, which will provide crucial data for its subsequent safe operation, according to the Jiangsu provincial transport engineering construction bureau, the bridge's developer.

Spanning 10.03 kilometers, this engineering milestone integrates highways, intercity railways, and local roads across two levels. Its main channel features a record-setting 1,208-meter central span supported by cables, while its two auxiliary channel bridges each boast 388-meter steel arch spans, the longest worldwide for their type.

All load testing occurs exclusively at night to avoid temperature fluctuations affecting the steel-based structure, with over 800 sensors deployed to track micrometer-level structural shifts, according to the bureau.

During the first night's static test, 30 four-axle trucks weighing 1,200 tonnes were positioned like "six vehicles side-by-side on the upper highway deck and four on the lower rail-road deck," according to technicians, mimicking the weight of 800 passenger cars. The trucks remained stationary for eight hours to measure structural responses.

Seven days of trials cover 119 static and 111 dynamic scenarios across all bridge sections. The most intense static test will mobilize 110 trucks weighing 4,400 tonnes simultaneously on the main span, according to the bureau.

Dynamic examinations later this week include simulated traffic flows with braking and bumping sequences.

Scheduled for completion by late 2025, the bridge will slash travel time between Changzhou and Taizhou in Jiangsu province from 80 minutes to 20 minutes, boosting development for the Yangtze economic belt and integration of the Yangtze River delta region.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 欧美国产中文字幕| 金莲你下面好紧夹得我好爽| 成人精品视频99在线观看免费| 女博士梦莹凌晨欢爱| 久久综合九色综合欧美就去吻 | 美女视频黄a视频全免费网站色| 国产精品三级电影在线观看| silk131中字在线观看| 日本最大色倩网站www| 亚洲国产欧美久久香综合| 精品久久久久久中文字幕| 国产午夜无码福利在线看网站| 6080新视觉| 女性高爱潮视频| 久久久久99精品国产片| 模特侨依琳大尺度流出| 亚洲精品在线网| 精品国产三级a∨在线观看| 国产偷国产偷亚洲高清在线| yy6080一级毛片高清| 在线免费成人网| 一个人看的免费观看日本视频www| 日本videoshd高清黑人| 五十路六十路绝顶交尾| 欧美日韩黄色大片| 人妻在线日韩免费视频| 精品成人AV一区二区三区| 国产亚洲欧美日韩精品一区二区| 人人添人人澡人人澡人人人爽| 国内揄拍高清国内精品对白| 一区二区三区91| 成年视频在线播放| 久久伊人精品青青草原高清| 校花小雪和门卫老头阅读合集| 亚洲欧洲日韩国产| 狠狠干中文字幕| 再深点灬好舒服灬太大了添| 老司机精品视频在线观看| 国产呻吟久久久久久久92| 日本黄网站动漫视频免费| 国产精品熟女一区二区|